|
Cascade Sun Works Current Projects |
Memaloose State Park, Oregon
Oregon Parks and Recreation Department contracted with Cascade Sun Works to design and furnish a solar system that could be readily adapted to a variety of existing as well as new State Park buildings. Memaloose State Park is the pilot project.
Columbia General Contracting of
Clackamas, OR installed the DayStar Thermal System.
Art Stockdale (503) 793-4360
Commercial DayStar Thermal System furnishing hot water for multi shower restroom facility located in the Columbia River Gorge Scenic Area. DayFlow multi-zone control with 320 ft2 of collection, 250 gallons storage and Takagi T-M1 back-up. This system can produce over 320,000 BTUs of hot water per day.
|
e-mail info@sun-works.com |
||||||||
| Home | Workshops | Events & News | Links | |||||
|
||||||||
|
Redmond Showroom |
||||||||
|
Bringing renewable energy home, today |
||||||||